logo
PAL Policy Analytics Lab

Pre-Feasibility Study for Logistics Center in Filyos Valley 1 December 2020

Project Name: Pre-Feasibility Study for Logistics Center in Filyos Valley

Country: Türkiye

Start Date: 01-07-2020

End Date: 01-12-2020

Client Name: BAKKA - Western Black Sea Development Agency

Project Details: 

The project aimed to evaluate the need for establishing a logistics center (LC) in the region with a focus on the Filyos Valley Project. The Filyos Valley Project consists of the establishment of the Filyos Port with an annual capacity of 25 million tons and the adjacent 597 hectares Industrial Zone.

The project has been prepared to determine the feasibility of establishing a Logistics Center in the field and within the region, to generate investment ideas in potential investors, and to provide a basis for detailed feasibility studies. The development potential of the region have been analyzed, and based on the findings, scenarios have been developed, and a technical, economic, financial, spatial, and managerial assessment of a potential logistic center has been conducted.
As the project contractor. PAL carried out extensive on-site investigations and collected relevant data through interviews and surveys. Additionally, they conducted desk research, analyzing available data and information. Based on these activities, PAL delivered a comprehensive final report summarizing their findings, conclusions, and recommendations.

To access the report, click here.  (In Turkish)